MICROBT · 160 TH/S REFERENCE VARIANT

WhatsMiner M60 Calculator

160 TH/s shop listing. Power is derived from listed hashrate × efficiency; it is not a separately verified wall-power specification.

Manufacturer hashrate
160 TH/s
Calculated power
3,184.0 W
Manufacturer efficiency
19.9 J/TH
Algorithm
SHA-256

Data last checked: 2026-09-27. Manufacturer specification source: official reference ↗. Unknown fields remain unverified.

$0.00$0.30/kWh

Energy / day
76.42 kWh
Electricity / month
$183.40
Electricity / year
$2,231.35
Estimated BTC / day
0.00007615
Gross revenue / day
$6.41
Pool fees / day
$0.13
Operating profit / day
$0.17
Operating profit / month
$5.05
Operating profit / year
$61.42
Break-even electricity
$0.0822/kWh
Break-even BTC price
$81,919.92
Simple hardware payback
Enter hardware price
Annual operating return
Unavailable

Source: current user inputs and published formulas. Last updated: on each input change.

Assumes current network conditions remain constant. Estimates exclude taxes, financing, repairs and resale value.

Last updated: . Source: mempool.space — BTC/USD price, mempool.space — estimated network hashrate and current difficulty, mempool.space — mean fees of latest 10 confirmed blocks; subsidy derived from next height.

WhatsMiner M60 electricity cost

The reference 3,184.0 W load consumes 76.42 kWh per full day. At $0.08/kWh that is $6.11 per day, $183.40 per 30-day month and $2,231.35 per year. These are calculated costs, not manufacturer claims.

Profitability at this hashrate

The 160 TH/s reference contributes 160,000,000,000,000 hashes per second to the difficulty-based model. Expected BTC production requires difficulty, subsidy and estimated block fees. The calculator above displays revenue only when those values and a BTC price have a valid source.

Run a WhatsMiner M60 revenue scenario →

Break-even electricity

At full uptime, divide daily proceeds after pool fees by 76.42 kWh to obtain this reference’s operating tariff threshold. Each $0.01/kWh adds $0.76 per day to the electricity bill. Hardware recovery and hosting fees are separate.

Efficiency: rated and calculated

The manufacturer lists 19.90 J/TH. Dividing the reference power by hashrate gives 19.9000 J/TH. Power itself is derived from the same rating, so this ratio is not an independent measurement.

Heat output

3,184.0 W corresponds to 10,864.3 BTU/hour. Nearly all electrical input ultimately becomes heat. Running power determines peak heat even when average uptime is reduced.

Cooling requirements

The reference heat load is 0.905 cooling tons. At 25°C intake and 35°C exhaust, the ideal all-air equivalent is 950 m³/h. This excludes pressure loss, humidity, altitude and recirculation. Hydro references require separate coolant engineering.

Operating cost beyond ASIC power

Adding an illustrative 10% facility-power allowance to this reference adds $0.61 per day at $0.08/kWh. It does not increase the 160 TH/s nominal hashrate. Hosting management, repairs and capital must be entered separately.

Add this model to a farm scenario →

Methodology

Daily kWh = watts ÷ 1,000 × 24 × uptime. BTC/day uses difficulty × 2³² expected hashes per block. Heat = watts × 3.412142 BTU/hour. Assumes current network conditions remain constant.

Read formulas, limits and omitted costs →

Frequently asked questions

Which WhatsMiner M60 variant is used?

160 TH/s reference variant. 160 TH/s shop listing. Power is derived from listed hashrate × efficiency; it is not a separately verified wall-power specification.

How much electricity does this WhatsMiner M60 use in a day?

76.42 kWh at the reference running power and 100% uptime. Change watts or uptime in the calculator for your measured scenario.

Does a positive operating estimate recover the hardware price?

No. Operating profit excludes capital. Enter your purchase price and use simple payback; future network conditions are not guaranteed.

Interactive cooling scenario

Loading cooling inputs…

Electricity sensitivity table

Fixed reference scenario: WhatsMiner M60, 3,184.0 W, 100% uptime, 2% pool fee. Interactive inputs above do not overwrite this reference table.

Server-rendered reference costs · 30-day months · 365-day years
Rate / kWhkWh / dayElectricity / dayElectricity / monthElectricity / yearRevenue / dayProfit / dayProfit / month
$0.0376.42$2.29$68.77$836.76$6.41$3.99$119.67
$0.0476.42$3.06$91.70$1,115.67$6.41$3.22$96.75
$0.0576.42$3.82$114.62$1,394.59$6.41$2.46$73.82
$0.0676.42$4.58$137.55$1,673.51$6.41$1.70$50.90
$0.0776.42$5.35$160.47$1,952.43$6.41$0.93$27.97
$0.0876.42$6.11$183.40$2,231.35$6.41$0.17$5.05
$0.0976.42$6.88$206.32$2,510.27$6.41$-0.60$-17.88
$0.1076.42$7.64$229.25$2,789.18$6.41$-1.36$-40.80
$0.1276.42$9.17$275.10$3,347.02$6.41$-2.89$-86.65
$0.1576.42$11.46$343.87$4,183.78$6.41$-5.18$-155.43
$0.2076.42$15.28$458.50$5,578.37$6.41$-9.00$-270.05

Source: the cited reference power and published formulas. Manufacturer data last checked: 2026-09-27. Revenue is a dated scenario using the snapshot below, not a continuously updated quote. Assumes current network conditions remain constant.

Network snapshot last updated: 2026-09-29T12:30:05.000Z. Source: mempool.space — BTC/USD price mempool.space — estimated network hashrate and current difficulty mempool.space — mean fees of latest 10 confirmed blocks; subsidy derived from next height . Refresh the page to request a newer snapshot.

Data sources and field provenance

Data last checked: 2026-09-27. Manufacturer specification source: official reference ↗.

Published specifications, editorial record review and explicit unknowns
FieldValueSourceChecked
hashrate160MicroBT2026-09-27
powerWattsNot verifiedUnknownNot verified
efficiencyJTH19.9MicroBT2026-09-27
algorithmSHA-256MicroBT2026-09-27
releaseDateNot verifiedUnknownNot verified
coolingTypeNot verifiedUnknownNot verified
noiseDbNot verifiedUnknownNot verified
dimensionsNot verifiedUnknownNot verified
weightKgNot verifiedUnknownNot verified
Calculated power3,184.0 WHashrate × rated J/THDerived on render

Unknown source URLs are null. Record-level references were preserved from the initial review; no new manufacturer verification date is invented. Read the source policy →

Related ASIC references

Curated comparisons

Related calculators