FREE MINING TOOL

Mining profitability calculator

Estimate Bitcoin revenue, pool fees and operating profit using a sourced network snapshot.

Reference values are editable. Check your measured wall power.
$0.00$0.30/kWh

Energy / day
84.00 kWh
Electricity / month
$201.60
Electricity / year
$2,452.80
Estimated BTC / day
0.00009545
Gross revenue / day
$8.01
Pool fees / day
$0.16
Operating profit / day
$1.13
Operating profit / month
$33.89
Operating profit / year
$412.37
Break-even electricity
$0.0934/kWh
Break-even BTC price
$71,839.15

Source: current user inputs and published formulas. Last updated: on each input change.

Assumes current network conditions remain constant. Estimates exclude taxes, financing, repairs and resale value.

Last updated: . Source: mempool.space — BTC/USD price, mempool.space — estimated network hashrate and current difficulty, mempool.space — mean fees of latest 10 confirmed blocks; subsidy derived from next height.

Formula and assumptions

BTC/day = TH/s × 10¹² × 86,400 × uptime ÷ (difficulty × 2³²) × (subsidy + average fees/block). Net = BTC/day × BTC price × (1 − pool fee) − electricity.

The difficulty-based model estimates statistical production, not pool luck, rejected shares or future difficulty changes. Missing network data is never assumed zero revenue.

Full methodology and limitations →

Worked example

Illustrative only: if gross revenue is $10/day and the pool fee is 2%, a $6.72 electricity bill leaves $3.08/day before other expenses. This is arithmetic, not market data.

Arithmetic examples explain the tool; they are not live market observations. Reference specifications are linked on ASIC pages.

Inspect sources →

Frequently asked questions

Why are revenue values unavailable?

A fresh, sourced network snapshot must be configured. Costs work independently.

Does operating profit include hardware?

No. Use ROI for capital recovery or hosting for management charges.

Related ASIC references

Related calculators