FREE MINING TOOL

Mixed mining farm calculator

Combine multiple ASIC models, facility overhead and hosting fees to estimate fleet energy, revenue and simple payback.

Build your fleet

Up to 20 rows. All figures are editable; additional facility power is an illustrative allowance, not measured data.

Fleet row 1

Combined farm results

Total ASICs
100
Total hashrate
20,000.00 TH/s
ASIC running power
350,000 W
Additional facility power
35,000 W
Total running power
385,000 W
Total load
385.000 kW
Energy / day
9,240.00 kWh
Energy / month
277,200.00 kWh
Electricity / day
$739.20
Electricity / month
$22,176.00
Electricity / year
$269,808.00
Heat output
1,313,674.7 BTU/h
Cooling load
109.473 tons
Ideal all-air airflow
114,925 m³/h
Entered hardware subtotal
$0.00
Estimated BTC / day
0.00952597
Gross revenue / day
$801.24
Gross revenue / month
$24,037.16
Pool fees / day
$16.02
Net operating profit / day
$46.01
Net operating profit / month
$1,380.42
Break-even electricity
$0.0850/kWh
Simple payback
No finite estimate

Hardware prices are incomplete. The subtotal is not a full investment estimate; payback is withheld.

Source: user inputs and referenced ASIC ratings, including derived power where applicable. Last updated: on input change. Additional facility power follows uptime for energy; thermal load assumes simultaneous operation.

Assumes current network conditions remain constant. Hosting is a fleet-wide monthly fee. Taxes, financing and repairs are excluded.

Network last updated: 2026-09-29T13:32:04.000Z. Source: mempool.space — BTC/USD price mempool.space — estimated network hashrate and current difficulty mempool.space — mean fees of latest 10 confirmed blocks; subsidy derived from next height

Formula and assumptions

Farm watts = Σ(unit watts × count) × (1 + facility overhead / 100). Revenue sums each row; net deducts electricity, pool fees and monthly hosting.

Add up to 20 fleet rows. The common uptime scales ASICs and facility overhead together. Hosting is a monthly fleet-wide fee; avoid counting electricity twice if it is bundled in your quote.

Full methodology and limitations →

Worked example

100 S21 references plus 50 M60 references draw 509,200 W before facility overhead. With 10% overhead: 560,120 W and 13,442.88 kWh/day at full uptime.

Arithmetic examples explain the tool; they are not live market observations. Reference specifications are linked on ASIC pages.

Inspect sources →

Frequently asked questions

Can I combine different models?

Yes. Power and production are summed for each row, preserving different efficiencies.

What if some hardware prices are missing?

The entered subtotal is shown, but payback requires a positive hardware quote on every row.

Related ASIC references

Related calculators