BITMAIN · 473 TH/S REFERENCE VARIANT

Antminer S21 XP Hydro Calculator

473 TH/s at 35°C inlet coolant. Heat is transferred into a liquid loop; room airflow alone does not size that loop.

Manufacturer hashrate
473 TH/s
Manufacturer power
5,676.0 W
Manufacturer efficiency
12.0 J/TH
Algorithm
SHA-256

Data last checked: 2026-09-27. Manufacturer specification source: official reference ↗. Unknown fields remain unverified.

$0.00$0.30/kWh

Energy / day
136.22 kWh
Electricity / month
$326.94
Electricity / year
$3,977.74
Estimated BTC / day
0.00022511
Gross revenue / day
$18.95
Pool fees / day
$0.38
Operating profit / day
$7.67
Operating profit / month
$230.16
Operating profit / year
$2,800.27
Break-even electricity
$0.1363/kWh
Break-even BTC price
$49,398.94
Simple hardware payback
Enter hardware price
Annual operating return
Unavailable

Source: current user inputs and published formulas. Last updated: on each input change.

Assumes current network conditions remain constant. Estimates exclude taxes, financing, repairs and resale value.

Last updated: . Source: mempool.space — BTC/USD price, mempool.space — estimated network hashrate and current difficulty, mempool.space — mean fees of latest 10 confirmed blocks; subsidy derived from next height.

Antminer S21 XP Hydro electricity cost

The reference 5,676.0 W load consumes 136.22 kWh per full day. At $0.08/kWh that is $10.90 per day, $326.94 per 30-day month and $3,977.74 per year. These are calculated costs, not manufacturer claims.

Profitability at this hashrate

The 473 TH/s reference contributes 473,000,000,000,000 hashes per second to the difficulty-based model. Expected BTC production requires difficulty, subsidy and estimated block fees. The calculator above displays revenue only when those values and a BTC price have a valid source.

Run a Antminer S21 XP Hydro revenue scenario →

Break-even electricity

At full uptime, divide daily proceeds after pool fees by 136.22 kWh to obtain this reference’s operating tariff threshold. Each $0.01/kWh adds $1.36 per day to the electricity bill. Hardware recovery and hosting fees are separate.

Efficiency: rated and calculated

The manufacturer lists 12.00 J/TH. Dividing the reference power by hashrate gives 12.0000 J/TH. Small differences can result from nominal specification rounding; compare values at the same operating point.

Heat output

5,676.0 W corresponds to 19,367.3 BTU/hour. Nearly all electrical input ultimately becomes heat. This hydro model rejects heat through a liquid loop; airflow alone cannot design its cooling system.

Cooling requirements

The reference heat load is 1.614 cooling tons. At 25°C intake and 35°C exhaust, the ideal all-air equivalent is 1,694 m³/h. This excludes pressure loss, humidity, altitude and recirculation. Hydro references require separate coolant engineering.

Operating cost beyond ASIC power

Adding an illustrative 10% facility-power allowance to this reference adds $1.09 per day at $0.08/kWh. It does not increase the 473 TH/s nominal hashrate. Hosting management, repairs and capital must be entered separately.

Add this model to a farm scenario →

Methodology

Daily kWh = watts ÷ 1,000 × 24 × uptime. BTC/day uses difficulty × 2³² expected hashes per block. Heat = watts × 3.412142 BTU/hour. Assumes current network conditions remain constant.

Read formulas, limits and omitted costs →

Frequently asked questions

Which Antminer S21 XP Hydro variant is used?

473 TH/s reference variant. 473 TH/s at 35°C inlet coolant. Heat is transferred into a liquid loop; room airflow alone does not size that loop.

How much electricity does this Antminer S21 XP Hydro use in a day?

136.22 kWh at the reference running power and 100% uptime. Change watts or uptime in the calculator for your measured scenario.

Does a positive operating estimate recover the hardware price?

No. Operating profit excludes capital. Enter your purchase price and use simple payback; future network conditions are not guaranteed.

Interactive cooling scenario

Loading cooling inputs…

Electricity sensitivity table

Fixed reference scenario: Antminer S21 XP Hydro, 5,676.0 W, 100% uptime, 2% pool fee. Interactive inputs above do not overwrite this reference table.

Server-rendered reference costs · 30-day months · 365-day years
Rate / kWhkWh / dayElectricity / dayElectricity / monthElectricity / yearRevenue / dayProfit / dayProfit / month
$0.03136.22$4.09$122.60$1,491.65$18.95$14.48$434.49
$0.04136.22$5.45$163.47$1,988.87$18.95$13.12$393.63
$0.05136.22$6.81$204.34$2,486.09$18.95$11.76$352.76
$0.06136.22$8.17$245.20$2,983.31$18.95$10.40$311.89
$0.07136.22$9.54$286.07$3,480.52$18.95$9.03$271.03
$0.08136.22$10.90$326.94$3,977.74$18.95$7.67$230.16
$0.09136.22$12.26$367.80$4,474.96$18.95$6.31$189.29
$0.10136.22$13.62$408.67$4,972.18$18.95$4.95$148.42
$0.12136.22$16.35$490.41$5,966.61$18.95$2.22$66.69
$0.15136.22$20.43$613.01$7,458.26$18.95$-1.86$-55.91
$0.20136.22$27.24$817.34$9,944.35$18.95$-8.67$-260.25

Source: the cited reference power and published formulas. Manufacturer data last checked: 2026-09-27. Revenue is a dated scenario using the snapshot below, not a continuously updated quote. Assumes current network conditions remain constant.

Network snapshot last updated: 2026-09-29T12:30:05.000Z. Source: mempool.space — BTC/USD price mempool.space — estimated network hashrate and current difficulty mempool.space — mean fees of latest 10 confirmed blocks; subsidy derived from next height . Refresh the page to request a newer snapshot.

Data sources and field provenance

Data last checked: 2026-09-27. Manufacturer specification source: official reference ↗.

Published specifications, editorial record review and explicit unknowns
FieldValueSourceChecked
hashrate473Bitmain2026-09-27
powerWatts5676Bitmain2026-09-27
efficiencyJTH12Bitmain2026-09-27
algorithmSHA-256Bitmain2026-09-27
releaseDateNot verifiedUnknownNot verified
coolingTypehydroBitmain2026-09-27
noiseDbNot verifiedUnknownNot verified
dimensionsNot verifiedUnknownNot verified
weightKgNot verifiedUnknownNot verified

Unknown source URLs are null. Record-level references were preserved from the initial review; no new manufacturer verification date is invented. Read the source policy →